Pat  Holdgate's
EAGLE  SCOUT

SERVICE  PROJECT


  Restoring   the   Sandown   Historical   Society's
Revolutionary  War  Cannon


AFTER  RESTORATION

 


BEFORE  RESTORATION

Click on
thumbnail
for larger
photo

AFTER  RESTORATION

 

BEFORE  RESTORATION


CLICK  HERE  TO  SEE  MY  LIST  OF  SPONSORS!
 

Cannon  Home  Page
navigate with these buttons

Home PageWork PhasesFundraisingNews  CoverageProject Complete
0=Original  1=Moving Out  2=Disassembly  3=Sanding  4=New Wheels  5=Painting
6=Reassembly  7=Site Prep  8=Moving Back  9=Almost  10=DONE!  11=Ceremony

 

The Sandown Historical Society thought a good Boy Scout Eagle Service Project to do would be to restore a cannon that they had.   It is a reproduction, not a genuine or authentic, English cannon from the Revolutionary War.   This cannon was reportedly built in the 1970's but has deteriorated due to being outdoors.   The wood of the cannon wheels and the some of the carriage parts had really deteriorated.    My project led the team to replace the wheels, sand down and repaint all the wood, sandblast and repaint the metal, and re-position the cannon at the tip of the Sandown Historical Society property on Main Street.    I used the famous Molly Stark Cannon, which is also an English cannon, as the guide for the improvements.   Many thanks to donors, other Boy Scouts, and adults helping with the work, and the Sandown Historical Society for all the support.   Contact me at prholdgate@yahoo.com for info.

     
     

0 = Original  Cannon  "Before"  Pictures
  Click on thumbnail for larger photo 

   
     

 

The original wheels could not be saved.

 

 
     

The  Famous  Molly  Stark  Cannon
  Click on thumbnail for larger photo 

     
     
     

Newspaper  Coverage  of  Project
  Click on thumbnail for larger photo 

 


Click on thumbnail for larger photo

 


 

Click on thumbnail for larger photo

 

 

Click on thumbnail for larger photo

 

 

Click on thumbnail for larger photo

 
     
     
 

 
 

prholdgate@yahoo.com
 

 

Home PageWork PhasesFundraisingNews  CoverageProject Complete
0=Original  1=Moving Out  2=Disassembly  3=Sanding  4=New Wheels  5=Painting
6=Reassembly  7=Site Prep  8=Moving Back  9=Almost  10=DONE!  11=Ceremony